English
37
Appendix A Commissioning Report
Installer Information
End User Information
Name :
Name :
Phone :
Phone :
Address :
Address :
Commissioning Report (1/2)
Home ID (9 digits)
:
Q.HOME (Q.VOLT) S/N (18 digits)
:
Home ID (9 digits) provided to end user? :
Yes / No
PIN Code (4 digits) provided to end user? :
Yes / No
Server registration successfully completed?
:
Yes / No
Use precautions explained to end user?
:
Yes / No
Precautions
■
If the ESS cannot remain connected to grid AC power after commissioning, the PV Switch
on the Q.VOLT and the Battery DC Switch on the Q.SAVE must be switched OFF in order to
avoid any damage to the Battery Pack.
■
In case you install more than two Q.SAVEs to one Q.VOLT, make sure to plug a BMS
Communication Cable to the “OUT” terminal on the Q.SAVE for Q.VOLT connection, and plug
another cable to the “IN” terminal for the next Q.SAVE connection.
■
Make sure to complete all configurations before switching ON the PV Switch and the Battery
DC Switch for safety.
Please, go to the next page
Do You Have Any Comments?
Installer Signature
End User Signature
Date :
Date :
Signature :
Signature :