![PVA PCP Series Operation Manual Download Page 38](http://html.mh-extra.com/html/pva/pcp-series/pcp-series_operation-manual_1628592038.webp)
PCP Series Manual
Revision A
/
September 2020
Page 38 of 46
Calibration
1.
Select
Manual
from the cycle stop screen.
2.
Select the
PCP050
tab.
3.
Select the
Calibration
tab.
4.
In the
Shot Speed
dropdown menu, select
Low
.
5.
Under
Begin
Shot
, select
Go
. After the shot finishes, weigh the dispensed material
and type it into the
Lo Wgt. g
text field.
6.
In the
Shot Speed
dropdown menu, select
High
.
7.
Under
Begin
Shot
, select
Go
. After the shot finishes, weigh the dispensed material
and type it into the
High Wgt. g
text field.
8.
Under Calculate Offset, select
Go
.
The calibration for the selected pump is now complete. Select the next pump and repeat
the calibration procedure.
Figure 46: Calibration Screen