
Document No.: 1P0446-1 Rev. B, April 7, 2014
13
Section 3 -
Unpacking
The IoN 3 MHz Plasma System is completely tested and inspected at the factory before shipping.
Inspect the crate before unpacking. If there is any reason to suspect damage to the carton or its
contents, make note of the damage, take pictures and report it to the shipping company. All pictures
and information should be sent to PVA TePla America Inc. as well. All systems are shipped with tilt
indicators. Your shipping department should inspect the crate and all tilt indicators prior to accepting
the shipment.
Using the included packing list, check to ensure that all listed components have arrived at your
facility. Unpack the shipping cartons carefully and inspect the main plasma unit and all other system
components for any damaged or missing items.
If any component is damaged or missing, notify the shipper and notify the PVA TePla America Inc.
Customer Service Department by TELEPHONE immediately. Claims based on late notification of
shipping damage will be denied.
Keep all shipping containers and materials in case it should be necessary to return any item to PVA
TePla America Inc. All service and warranty work is done
at the manufacturer’s site
.
Place the system components on the selected work surfaces. Remove all packing materials including
any that might be present in the chamber of the system. Please view the video on the proper start-up
of your IoN 3 MHz before starting your system.
3.1
Long Term Storage
If the plasma system and vacuum pump are to be placed in long term storage, take the following
precautions in order to keep the equipment in good working condition. All system components should
be placed in protective packaging. A desiccant
should be placed in the packaging to minimize
moisture exposure. Storage should be in a room with humidity less than eighty percent.
Before packaging and storing the vacuum pump, fill the pump reservoir with oil to the proper level
and run the pump for five minutes to lubricate the seals. During the time the pump is stored, you will
also need to run the pump for five minutes every three months in order to keep the seals lubricated.