
DBI (HART) INSTRUCTION MANUAL
16
Closed Vessel Installation
“L” should as a minimum be at least that as detailed in the table above but
can be greater if required. The dBi Series Intelligent Transducer can be
simply screwed into a flange and secured using the rear 1" BSP/NPT rear
thread or via the 1½″ or 2″ front t
hread, dependant on model.
Where possible, use a flange made of a synthetic material such as PVC, in
cases where a metal flange is used it is advisable to fit a suitable gasket
between the flange of the dBi Series Intelligent Transducer and the
connection to the vessel.
Standpipe Installations
When mounting the dBi Series Intelligent Transducer to a standpipe care
should be taken to ensure that the standpipe is of sufficient diameter with
reference to its length, see the table below for details:
DIA. (D)
MAX LENGTH
mm
inches
mm
inches
80
3
220
8
100
4
300
12
150
6
420
16
200
8
560
22
dBi Flange mounted via Front
Thread
Optional Flange Mounted dBi
Summary of Contents for dBi 10
Page 2: ...2...
Page 11: ...PULSAR MEASUREMENT 11 EU Declaration of Conformity...
Page 23: ...PULSAR MEASUREMENT 23...
Page 24: ...DBI HART INSTRUCTION MANUAL 24...