5.1 Removing Dead Front Access Plate
5.1.1 Locate Dead Front Access Plate set screw and remove
5.1.2 Set aside for reuse.
5.1.3 Review Equipment Ground Connection Points
5.1.4 Review Neutral Connection points
5.2 Wiring Ground Connections
5.2.1 Ensure enclosure is grounded as per NEC and Local Jurisdictions Code requirements.
5.2.2 If Using for Service Equipment, bond the neutral to the ground bus bar and follow NEC and
Local Jurisdictions Code requirements.
5.2.3 Tighten connections as per manufacturers specifications.
Figure 5:
Mounting Location of External Enclosure
Ground Connection