![ProteOn XPR36 User Manual Download Page 170](http://html1.mh-extra.com/html/proteon/xpr36/xpr36_user-manual_1620131170.webp)
ProteOn XPR36 | Maintenance
152
•
Dispose of solutions according to the instructions on their labels
Scheduled Maintenance Wizards
It is necessary to run the following maintenance wizards to keep the
instrument in proper working order and ensure consistent results.The
maintenance wizards are available on the Maintenance screen:
•
Prime
•
Weekly Cleaning
•
Postexperiment Cleaning
•
Clean MCM
•
Syringe Maintenance/Replacement
•
Optional OQ (refer to OQ manual)
Click Maintenance in the Instrument tab to open the Maintenance screen.
The Maintenance Status table reminds you to perform recommended
maintenance as scheduled. While you do not have to perform the
recommended maintenance when you are prompted, reminders will continue
to appear until you do so. Prime, Weekly, Post-experiment, and Syringe
wizards automatically move to maintenance standby mode at the end.
Summary of Contents for XPR36
Page 1: ...ProteOn XPR36 Protein Interaction Array System Protein Interaction Analysis User Manual...
Page 2: ......
Page 3: ...ProteOn XPR36 Protein Interaction Array System Version 3 1 User Manual...
Page 4: ......
Page 10: ...ProteOn XPR36 System viii...
Page 166: ...ProteOn XPR36 System Analysis 148...
Page 188: ...ProteOn XPR36 Maintenance 170...
Page 194: ...ProteOn XPR36 System ProteOn System Troubleshooting 176...
Page 226: ...ProteOn XPR36 System A ProteOn XPR36 Instrument and Peripherals 208...
Page 250: ...ProteOn XPR36 System E Ordering Information 232...
Page 264: ...ProteOn XPR36 System F Security Edition Configuration Guide 246...
Page 276: ...ProteOn XPR36 System Glossary 258...
Page 287: ......