Operating and Installation Instructions ProTect Safes Grad S2
1. Scope of delivery
The delivery comprises:
For models with electronic locks – operating instructions for the safe, operating instructions for the lock, anchor
bolt.
For models with key locks – 2 keys for the outer door, operating instructions for the safe, anchor bolt.
2. Installation of the safe
Important: Please check the bearing capacity of the floor prior to installing the safe. The floor must
indicate at least the weight of the safe per square metre.
The concrete should have a crushing strength of up to 30Nm (4,350psi) and should be reinforced with
reinforcing steel with a diameter of at least 8mm and a mesh spacing of 150mm.
(Generally, a floor bearing capacity of at least 0.5kg/cm
²
is applicable for all types of safes.) It is
recommended to be very careful when installing the safe. Prior to bolting the door should be opened and
closed for a few times to ensure functionality. In case the safe is to be bolted to the floor, the open door
should be lined with appropriate materials to prevent the risks associated with tipping of the safe.
1.
Mark the bore hole positions.
2.
Drill the holes in accordance with your anchor bolt and the table in item 7.
3.
Remove dust and place the anchor (without the bolt) into the bore hole.
4.
Align the safe to the bore hole.
5.
Secure the safe on the floor using the anchor bolt (the use of a torque wrench with the setting 30Nm is
recommended).
6.
Press the plastic cover onto the anchor bolt.
7.