
4.13
•
after unloading a lot where there is an old box, clean the residual material from the
load box edge, the walls and wall extensions,
•
close and secure the walls and wall extensions or chute opening,
•
before moving off make sure that tipping pin are in correct position, i.e. with the handle
facing downward and secured with cotter pin - see figure (4.2A).
DRAWING 4.2A CORRECT METHOD FOR INTERLOCKING TIPPING PIN
(1) tipping pin (2) securing cotter pin
Summary of Contents for T780
Page 2: ......
Page 5: ......
Page 17: ...1 10 ...
Page 43: ...3 14 ...
Page 72: ...5 13 DRAWING 5 6A CHASSIS GREASING POINTS ...
Page 73: ...5 14 DRAWING 5 7A LOAD BOX GREASING POINTS ...
Page 80: ...5 21 ...
Page 81: ...NOTES ...
Page 82: ... ...