The ends of the pneumatic conduit (1) must be cut exactly at right
angles.
Clamping ring (3) should be fitted according to figure (5.10).
Reinforcing sleeve (4) of the conduit must be thoroughly depressed.
Check tightness of connections in accordance with Chapter (5.3.2).
FIGURE 5.10 Installation of pneumatic conduit
(1) pneumatic conduit, (2) connecting nut (3) clamping ring, (4) reinforcing sleeve
5.4
HYDRAULIC SYSTEM MAINTENANCE
5.4.1 PRELIMINARY INFORMATION
Work connected with the repair, change or regeneration of hydraulic system components
(hydraulic cylinders, valves etc.) should be entrusted to specialist establishments, having the
appropriate technology and qualifications for this type of work.
The duties of the operator connected with the hydraulic system maintenance include:
Summary of Contents for T679
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 26: ...Pronar T679 SECTION 1 1 16 ...
Page 27: ...SECTION 2 SAFETY ADVICE ...
Page 44: ...Pronar T679 SECTION 2 2 18 FIGURE 2 3 Locations of information and warning decals ...
Page 45: ...SECTION 3 DESIGN AND OPERATION ...
Page 68: ...Pronar T679 SECTION 3 3 24 ...
Page 69: ...SECTION 4 CORRECT USE ...
Page 91: ...SECTION 5 MAINTENANCE ...
Page 118: ...Pronar T679 SECTION 5 5 28 5 6 TRAILER LUBRICATION FIGURE 5 11 Trailer s lubrication points ...
Page 133: ...NOTES ...
Page 134: ... ...