Chapter 3
3.7
PRONAR T672ECO
Construction and principle of operation
trailer operator.
The side walls of the load box are fas-
tened with locks in the wall and front, as
well as locks in the rear pillars (8). In the
lower part, the walls are blocked by means
of locking hooks located on the left and
right side of the upper frame (1). The rear
wall (5) is mounted in the rear pillar locks
and is locked by means of locking hooks
located in the rear part of the upper frame.
Closing and opening the side walls is done
with the help of two levers (7) located on
the front beam of the upper frame. In case
of the rear wall, locking and opening is
carried out using the lever (5) - see fi gure
(3.4) on the right side of the load box.
The extensions are attached like the walls
of the load box. The upper extension pins
are fastened with front extension and rear
post locks (9). The extensions are con-
nected to the walls with hinges (10).
The entrance ladders (11) and (12) are
attached to the wall and front extension.
From the inside of the wall and the front
extension, additional folding steps are
ADVICE
Drawings describing the construction of the trailer
show an example equipment configuration Detailed
information on all options can be found in the Equip-
ment chapter.
259-G.04-1
5
2
1
4
3
Figure 3.4
Back wall
(1) slide, (2) chute, (3) lever, (4) locking screw, (5) rear wall closing lever
Summary of Contents for T672ECO
Page 3: ...INTRODUCTION ...
Page 10: ...Introduction 8 PRONAR T672ECO ...
Page 11: ......
Page 12: ......
Page 15: ......
Page 16: ......
Page 17: ...GENERAL CHAPTER 1 ...
Page 32: ...SAFETY OF USE CHAPTER 2 ...
Page 51: ...Chapter 2 Safety of use 2 20 PRONAR T672ECO ...
Page 52: ...CONSTRUCTION AND PRINCIPLE OF OPERATION CHAPTER 3 ...
Page 71: ...RULES OF USE CHAPTER 4 ...
Page 101: ...PERIODIC INSPECTIONS OF THE TRAILER CHAPTER 5 ...
Page 131: ...TECHNICAL SUPPORT CHAPTER 6 ...
Page 147: ......
Page 148: ......
Page 150: ...APPENDIX A A 2 PRONAR T672ECO ...