![ProMinent Ultromat ULFa 1000 Assembly And Operating Instructions Manual Download Page 53](http://html1.mh-extra.com/html/prominent/ultromat-ulfa-1000/ultromat-ulfa-1000_assembly-and-operating-instructions-manual_1616951053.webp)
Materials required:
n
Weighing scales
n
PE bag (capacity min. 500 g)
1.
Loosen the screw fastenings to remove the wetting cone
2.
Hold a PE bag (min. fill-volume 500 g) beneath the feeder screw
pipe
3.
Start the calibration by pressing the
[START]
key.
4.
Wait until the calibration time has elapsed
5.
Weigh the feed chemical caught in the PE bag
6.
Enter the determined weigh as the
[ENTER WEIGHT]
parameter in
the control
ð
The capacity is recalculated and displayed as the parameter
[CAPACITY]
in
[kg/h]
7.
Refit the wetting cone once the dry feeder has been calibrated
10.2.2 Calibration liquid concentrate
Mode
Menu
Archive
Reset
Calibration Liquid
Unit Stop
Water
Powder Liquid
Flow mon.
Calibration time:
Elapsed time:
Enter weight:
Dosing capacity:
A0795
Fig. 29: Calibration liquid concentrate
Parameter
Factory setting
Adjustment range
Enter calibration time
60 s
0 - 999 s
Enter weight
-
99999.9
Interrupting the calibration
You can end the calibration at any time by pressing the
[STOP] key.
Carry out calibration
Operating Menu [F2]
53