![Prometal UNIVERSAL 1000 Maintenance Manual Download Page 80](http://html.mh-extra.com/html/prometal/universal-1000/universal-1000_maintenance-manual_1616666080.webp)
Maintenance manual Universal-1000
P R O M E T A L
80
Hopper maintenance
Check condition of
hydraulic cylnder and
bearings regulary! Clean
if needed and lubricate
according to plan (use
only
high quality grease).
Clean hopper by knocking off residual concrete. After this, open hopper outlets to enable the
loose concrete to drop into filler boxes with which the concrete is moved into mould and
removed from the machine together with the pallet.
Check all fixation screws.
Summary of Contents for UNIVERSAL 1000
Page 19: ...Maintenance manual Universal 1000 P R O M E T A L 19 ...
Page 25: ...Maintenance manual Universal 1000 P R O M E T A L 25 Hydraulic system ...
Page 26: ...Maintenance manual Universal 1000 P R O M E T A L 26 ...
Page 52: ...Maintenance manual Universal 1000 P R O M E T A L 52 Now lower down tamper head and mould ...
Page 53: ...Maintenance manual Universal 1000 P R O M E T A L 53 Pull out cart with mould on itself ...
Page 58: ...Maintenance manual Universal 1000 P R O M E T A L 58 After adjustment is done ...
Page 65: ...Maintenance manual Universal 1000 P R O M E T A L 65 Vibrator table maintenance ...