
50
Figure 16. Tap bolts into place
13.
Insert a 5/8 x 3-1/8 inch cold rolled dowel pin (PN MX03261) into the hole closest to the bottom bearing. Weld
the dowel to the auger tube.
Note: Only weld on one end of the dowel pin and only on the side of the pin farthest from the bottom bearing. Welding
both ends of the pin or completely around the end of the pin will make it difficult to extract the pin in future service
intervals.
Figure 17. Weld pin closest to the bottom bearing
6.3 BOTTOM BEARING INSTALLATION
1.
Place a bead of silicone in one continuous ring around the center of both sides of the auger seal (PN AGSL005)
and slide over the idler shaft (PN REJ314) on the outside of the mix auger frame.
Summary of Contents for P Series
Page 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Page 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Page 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Page 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Page 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Page 105: ... BATTERY V BATTERY V ...