Orion
Sentry by Orion
Revision 2.8
Semi-Automatic Stretch Wrapping Machine
27 August 2014
Introduction and Safety
Page 1-9
Installation and First Time Power Up
Unloading
Machine can be easily unloaded and transported by a forklift with a minimum capacity of
2500 lbs.
WARNING
Use caution when uprighting the tower. Injury could occur.
1.
If your model is a high tower, it may have the tower pivoted downward.
2.
Use a secured strap to pivot the tower upright, securely hold the tower upright. Bolt
the tower to the base using the four provided 10mm bolts. Make sure not to pinch any
electrical connectors.
Figure 1 - 1
Tower Pivot Point
Figure 1 - 2
Tower to Base Bolts
(1 of 4 shown)