9
5. Identify the Left Base Cover (82) and the Right
Base Cover (83). Slide the Left Base Cover onto
the Left Upright (89). Slide the Right Base Cover
onto the Right Upright (90).
Do not press the
Base Covers into place yet.
Identify the Left Upright Cover (79) and the Right
Upright Cover (80). Slide the Left Upright Cover
onto the Left Upright (89). Slide the Right Upright
Cover onto the Right Upright (90).
89
82
80
90
79
83
5
6. Cut the plastic tie in the Left Handrail (88) and
the Right Handrail (not shown). If necessary,
press the 5/16" Cage Nuts (31) back into place
(only one is shown).
Identify the Left Handrail (88) and hold it near
the Left Upright (89). Insert the Upright Wire (81)
through the bracket on the bottom of the Left
Handrail. Pull the Upright Wire out of the end of
the Left Handrail.
88
6
89
31
81
Tie