19 / 34
Chapter 3
Replacement Procedure
3.1.
Work Flow
Installation
Screen
Communication
Check the compatibility of
hardware in Chapter 2.
Receive screen data from
GP3000 Series.
*1
Remove GP3000 Series.
Install SP5000 series.
Connect the power cord.
Check the performance
and start operation.
Change the received data
on GP-Pro EX.
Check and modify the
data on GP-Pro EX.
Transfer the screen data
to SP5000 series.
Check the connection
between SP5000 series
and a PLC in the GP-Pro
EX Device/PLC
Connection Manual.
Connect SP5000 series
and PLC with the PLC’s
cable.
Start connection and
check the communi-
cation.
*1:
This step is required if screen data is saved only in the GP unit, not in any other device.
When replacing GP3000
series to SP5000 series
process the panel.