7
Assembling the mounting frame
Use 4.5 x 80mm countersunk head screws
to screw together the upright and
transverse parts of the mounting frame.
Installing the mounting frame
Attention - shaft work:
Protect yourself
and your tools against falling!
Place the mounting frame in the wall
opening.
Align vertically (plumb) and horizontally.
Arrange the all-round opening gap
uniformly.
Place packer material under the screw
fixing points. (Not included in the scope of
supply)
Let the transverse packer material at the
bottom protrude, it serves as a contact area
for the door element later.
Place packer material behind the vertical
frame.
Secure against falling out!
Summary of Contents for PRIODOOR ETX-RDA
Page 12: ...12 Technical information on the chain drive excerpts...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16 Chain motor technical data...
Page 17: ...17...
Page 21: ...21 Notes...