background image

 

 

 

4

 

 

Tips:

 

For

 

every

 

inch,

 

stop

 

and

 

press

 

FIRMLY

 

on

 

the

 

O

ring

 

into

 

the

 

channel.

  

 

You

 

will

 

see

 

that

 

the

 

O

ring

 

likes

 

to

 

pop

 

out

 

around

 

the

 

dips

 

around

 

the

 

screws.

  

Take

 

extra

 

time

 

in

 

these

 

areas

 

to

 

insure

 

you

 

are

 

pressing

 

the

 

O

ring

 

firmly

 

into

 

the

 

channel.

 

 

Next

 

is

 

the

 

most

 

difficult

 

step

 

and

 

requires

 

the

 

most

 

patience.

  

Please

 

read

 

completely

 

and

 

carefully

 

before

 

attempting.

  

See

 

tips

 

under

 

the

 

picture

 

to

 

the

 

left.

 

Dry

 

Hands

 

are

 

needed.

 

You

 

may

 

need

 

to

 

keep

 

a

 

towel

 

handy

 

to

 

keep

 

your

 

hands

 

dry

 

throughout

 

the

 

process.

 

 

Remove

 

the

 

center

 

frame

 

from

 

the

 

box.

 

Each

 

side

 

of

 

the

 

center

 

frame

 

has

 

an

 

O

ring

 

that

 

needs

 

to

 

be

 

installed.

  

Lay

 

the

 

frame

 

down

 

on

 

your

 

flat

 

surface

 

and

 

start

 

the

 

O

ring

 

in

 

one

 

corner

 

of

 

the

 

frame.

  

 

Begin

 

feeding

 

it

 

and

 

pressing

 

it

 

into

 

the

 

groove

 

of

 

the

 

frame.

 

Take

 

your

 

time,

 

if

 

you

 

go

 

too

 

fast

 

the

 

O

Ring

 

WILL

 

pop

 

out.

 

As

 

you

 

do

 

this,

 

you

 

will

 

need

 

to

 

stretch

 

the

 

O

ring

 

and

 

push

 

it

 

into

 

the

 

channel

 

a

 

little

 

each

 

¼

 

inch.

  

If

 

you

 

get

 

all

 

the

 

way

 

around

 

the

 

frame

 

and

 

your

 

O

ring

 

is

 

short

 

you

 

did

 

not

 

stretch

 

the

 

O

ring

 

enough

 

when

 

installing.

  

Start

 

Over.

 

 

Once

 

one

 

side

 

is

 

complete,

 

flip

 

over

 

frame

 

and

 

set

 

on

 

flat

 

surface.

 

(This

 

will

 

help

 

keep

 

the

 

O

ring

 

in

 

place

 

while

 

you

 

install

 

the

 

next

 

one.)

 

Repeat.

 

Proceed

 

to

 

Step

 

6.

 

Step

 

6

  

                      

Frame

 

to

 

pump

 

housing

 

 

 

Once

 

both

 

sides

 

of

 

the

 

frame

 

have

 

O

rings

 

installed,

 

the

 

frame

 

can

 

now

 

be

 

attached

 

to

 

the

 

pump

 

housing.

 

 

Place

 

the

 

frame

 

so

 

it

 

is

 

flush

 

on

 

the

 

edges

 

and

 

the

 

holes

 

line

 

up

 

for

 

the

 

through

 

screws.

 

Double

 

check

 

that

 

the

 

O

rings

 

are

 

still

 

in

 

place

 

and

 

are

 

not

 

visible.

 

 

Proceed

 

to

 

Step

 

7.

 

 

Step

 

7

 

                    

Faceplate

 

Install

 

(4

 

screws)

 

Summary of Contents for Myriad D5

Page 1: ...flat surface in front of you Myriad Reservoir System Congratulations on purchasing the most advance and versatile reservoir system ever built Please follow the install guide steps in the exact order...

Page 2: ...rrectly installed when the O ring sticks up out of the groove by about 1 32 inch Step 3 Box 3 Install and Secure Outlet Channel Cover Note Over tightening the screws in this next step will cause the a...

Page 3: ...oved and stop Now lay the paper back down on the acrylic It will not stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed...

Page 4: ...n one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out As you do this you will need to stretch the O ring and...

Page 5: ...the holes These screws are to be used in the center 4 holes ONLY Gently tighten the screws in the order shown in the picture to 80 then repeat to 100 100 should be the equivalent to hand tight tensio...

Page 6: ...he level of tightness you should achieve IMPORTANT If you see that the acrylic is touching making contact with the frame then the screw is too tight Untighten the screw until it does not make contact...

Page 7: ...hten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws per bracket to be...

Page 8: ...be the top right and bottom left when looking at the rear of the reservoir no matter the orientation As with any water cooling project testing new hardware before putting it into service is required T...

Page 9: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Reviews: