background image

 UT6x12-18HSS

Assembly Instructions V:04/22

9

ASSEMBLYNG

8

STEP 8

Bolt both driver and passenger side fenders onto the main frame of trailer.  

Once all 4 bolts are through, tighten. 

STEP 9

Using shrink wrap butt connectors, attach loose wire 

from fender to mainframe of trailer.  

Heat shrink. 

Test all lights on trailer.

Trailer light testing box 

8

8

HW-8

HW-8

HW-8

HW-8

Summary of Contents for UT6x12-18HSS

Page 1: ...INUM TRAILER MANUFACTURER W W W P R I M O T R A I L E R C O M Read this INSTRUCTIONS before using this product Failure to follow the safety rules and other basic safety precautions may result in serio...

Page 2: ...hitched to towing vehicle All trailer lighting is working correctly Loading is secured to trailer front and rear Tongue jack if trailer is equipped is retracted Tilt pin is latched Wheel lug bolts ar...

Page 3: ...f it comes loose Electric safety brake applies when cable pulls pin out of switch box 1 PULL hard to get pin out of switch box 2 CHECK brake by PULLING TRAILER with tow vehicle 3 ATTACH pin CABLE to t...

Page 4: ...Legs Middle legs Rear Legs Fender Tailgate Side Corner Front Wall BOLT S M6 50 x4 M8 100 x4 M8 130 x8 M8 100 x4 M8 110 x8 M12 80 x4 Med M6 20 x16 M8 100 x4 NUT M6 x4 M8 x4 M8 x8 M8 x4 M8 x8 M12 x4 M6...

Page 5: ...g 2 Gather the hardware package and stainless steel corner brackets 3 Gather both driver and passenger side fender 4 Gather rear bifold tailgate 5 Layout side walls on their correct side driver passen...

Page 6: ...and nylon nuts Then hand tighten only STEP 2 With bolts sticking through the side wall hang and attach side walls to the main frame of the trailer PRO TIP Make sure to not force bolts through the mai...

Page 7: ...04 22 7 ASSEMBLYNG STEP 4 After all sides are attached and hand tighten only install stainless steel corner caps on pipe top corners of the side kit rails STEP 5 Bolt on aluminum corner caps 7 7 7 6 2...

Page 8: ...UT6x12 18HSS Assembly Instructions V 04 22 8 ASSEMBLYNG STEP 6 Go through and tighten all nuts and bolts STEP 7 Install tailgate 5 1 5 HW 10 HW 10...

Page 9: ...r and passenger side fenders onto the main frame of trailer Once all 4 bolts are through tighten STEP 9 Using shrink wrap butt connectors attach loose wire from fender to mainframe of trailer Heat shr...

Page 10: ...UT6x12 18HSS Assembly Instructions V 04 22 10 ASSEMBLYNG 9 9 STEP 10 Mount the tires on the axle 1 2 3...

Page 11: ...p under normal use from the date of sale for the periods as stated Five year limited warranty on axle Three year conditional warranty on aluminum and aluminum welds One year on other components Commer...

Page 12: ...480 378 0800 2401 SOUTH 7 TH STREET PHOENIX ARIZONA 85034 Sales primotrailer com WWW PRIMOTRAILER COM...

Reviews: