Safety information
Prior to installing & operating your roaster please read the entire manual. If you see
this symbol in the manual, make sure to read what follows because it is a caution for
actions that can cause harm or damage to your machine and/or the operator.
Death, injury, or property damage can be caused because of improper installation,
adjustment, alteration, service, or maintenance. The entire installation guide must be
read prior to installing, cleaning, operating, or servicing this roaster.
It is the owner’s responsibility to ensure the installation, cleaning, and operation of the
roaster are done safely/properly. Only a qualified professional should operate this
roaster.
Keep any flammable items including but not limited to, gases, vapors, liquids, & solids,
far away from the roaster at all times. The roaster needs to have a fire extinguisher
nearby easily accessible incase of fire. Your local fire department will have information
on which fire extinguishers should be used. Fires may be caused from not cleaning the
roaster or exhaust system correctly and/or often enough.
The roaster needs 18 inches of space around it at all times.
Do not touch hot
surfaces.
Once the installation of the roaster is completed, you will need to have it inspected to
ensure it is compliant to local building codes. A local fire inspector must also inspect
the machine. These things must be done prior to operating. The Primo Roasting
Equipment warranty may be null/void if the inspections are not done. This would
relieve Primo Roasting Equipment from any liability that has to do with the use of the
machine & how the installation was done.
Instructions for what to do when the roaster operator finds a gas leak and/or smells
gas need to be posted in a location easily accessible/readable. Your local gas company
or company that supplies gas will have the instructions for you to get from them.
Summary of Contents for RAVEN XR15
Page 1: ......
Page 5: ...Frontview Scale 1 32 ...
Page 6: ...Leftside view Scale 1 32 ...
Page 7: ...Rearview Scale 1 32 ...
Page 8: ...Rightside view Scale 1 32 ...
Page 9: ...Topview Scale 1 32 ...
Page 10: ...Frontviewwith cyclone Scale 1 32 Roaster to Cyclone Connection Not Pictured Above ...