Instal l ati o n Re q ui re m e nts
Refer to the Important Safety Instructions before installing, operating or performing maintenance of clocks.
Verify network configuration
Before installation, verify the clock is configured for the network and can successfully check-in to your OneVue account at its
installation location.
Commonly a network is assigned to a clock during
. Your OneVue account ID and the settings provided during
device preconfiguration are configured into your clocks and each clock is labeled before they are shipped from Primex.
To verify the clock is configured, initiate a
.
For more information, see "Manual Check-In" on page 12.
Wireless operation installation guidelines
l
Clocks can be installed anywhere indoors within range of a 802.11 b/g wireless access point.
l
Clocks must have adequate signal to support wireless operation. A minimum wireless access point signal strength of -60 dBm is
required to support reliable wireless operation.
l
If signal strength is not reliable, the use of a wireless access point in closer proximity of the sensor installation location is
recommended.
l
Data packet size is typically less than 5 kilobytes (kB).
Electric powered analog clock installation guidelines
The socket-outlet shall be installed near the equipment and shall be easily accessible. Refer to the table below for power
specifications.
Model
Input Power
Current Draw
AC-Powered Single-sided
120V~, 47-63Hz
67mA@120V~
AC-Powered Dual-sided
120V~, 47-63Hz
134mA@120V~
AC-Powered clocks are supplied with a power cord with a two-prong plug. The two-prong plug may be removed for a hardwired
(pigtail) installation. Hardwired installation requires a 120V~ power line in a junction box installed by a licensed electrician. Leave a
minimum of 6 inches (15 cm) of cord inside the junction box.
14
Wi-Fi Analog Clock Install Guide