PrimeCables Cab-PC-08167 Installation Manual Download Page 1

F

4x4

D

x12

7

2

8

1

3

1

4

3

1

2

2

2

5

1

6

1

1

9

1

2

10

1

10

5

3

D

2

3

F

A

x6

F

A

5

6

4

C

C

x8

6

F

2

2

2

1

F

4x4

F

4x4

3

4

5

6

7

8

9

B

8

D

E

St4.2

8

20

1

C

24

Wrench 4x4mm

F

A

6

M6

Technical data

150KG

580-1230mm

1160-1860mm

3

Column qty

Max Loading capacity

Height range

Length range

Accessory list

Attention: The drawings below are only for reference which might be
slightly different from the actual object, please in kind prevail. Any
tools missing or installation problems, please contact the customer
service firstly.

Image

No.

Spec

Qty

M6

M6

M6

Item No.:Cab-PC-08167

Installation guide

Component list

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Part

No.

Qty

Pedestal pad

The first lifting 

column

The second

lifting column

Supporting plate

Left 

supporting beam

Right 

supporting beam

Baffle

Hand Switch 

(Option)

Power Plug

Cable

STEP 1

Install the supporting beams (5)(6)

Install lifting column (2)(3) and the supporting beams (5)(6)
together, use wrench (F) to tighten the screws (D).

STEP 2

Install the Feet

Install the feet (1) and the lifting column (2)
together, use wrench (F) to tighten the screws (C).

Take care during
the installation

Caution

Install supporting plate (4)

Install supporting plate (4) and supporting
beam (5)(6) together, use wrench (F) to
tighten the screws (A).

STEP 3

Reviews: