background image

12-drawer Tall Queen
Platform Storage Bed

Required Tools 

Screwdrivers

Flat Head

Using a power screwdriver 
will speed up  assembly. 

Caution

Do not over tighten any screw.
The last few turns of each screw 
should be done very slowly or by hand.

Phillips Head

Optional Tools

D

A

T

E

 S

T

A

M

P

Prepac Manufacturing Ltd.
6705 Dennett Place
Delta, BC V4G 1N4

LB-0638
2012-06-20

Model # BQ-6212

Assembly Instructions

CALL US FIRST

1-877-PREPAC1
1-877-773-7221

Mon - Fri

7am - 4pm PST
10am - 7pm EST

For help with assembly

If you have received a damaged or 
defective part or are missing hardware. 

 
We will process replacement parts 

UPS Ground or mail.

Before you call please:

2) Note 

the

3)  Review the contents of your shipment to 

determine what you are missing. This unit 
is shipped in 4 cartons. Make sure you 
have received all cartons.

in 2 

business days or less.  Parts are shipped via 

1)

Record the following information from the 
shipping label on the outside of the box.  
You will need it for warranty purposes:

Ship To Name 

Sales Order Number

 product model number.

Hammer

This product is shipped in 

4 cartons

Make sure you have all cartons. 

Sometimes cartons shipped on the same 

day get separated and are delivered on 

1 of 4

+

2 of 4

3 of 4

+

4 of 4

Online Option:

Fill out the Replacement Parts Order form in the Product 
Support section of our website: 

www.prepacmfg.com

Summary of Contents for BQ-6212

Page 1: ...re We will process replacement parts UPS Ground or mail Before you call please 2 Note the 3 Review the contents of your shipment to determine what you are missing This unit is shipped in 4 cartons Mak...

Page 2: ...Slide Screw 162 RM 0074 Package will contain more than required Bed Hardware Drawer Hardware Page 2 of 20 JRN Nut 24 RM 0312 JCB Connector 24 RM 0310 bronze cherry espresso RM 0314 black 8 per drawer...

Page 3: ...resso Inner Gables 2 GA 4131 black GA 4931 cherry GA 4631 espresso Upper Stabilizer 2 ST 4120 black ST 4920 cherry ST 4620 espresso Lower Stabilizer 2 ST 4121 black ST 4921 cherry ST 4621 espresso Ply...

Page 4: ...inutes Page 4 of 20 Drawer Slide Screw Attach metal U channels to each outer gable using drawer slide screws Note In the center of the U channels there are two pairs of holes Each pair has a small and...

Page 5: ...on outer gables as shown in the photo Position the Drawer Glides with A The wheel at the finished side B The wheel on the unfinished bottom Finished Side Bottom STEP 3 Estimated Time 10 minutes Use 1s...

Page 6: ...5 minutes Insert JRN nuts into the holes on each end of the inner gables The holes are drilled through You can insert them from either side B2 B2 Insert the nut as shown so that the hole lines up with...

Page 7: ...each end of the upper B3 and lower B4 stabilizers B4 Identifying the upper and lower stabilizers Upper Stabilizers Lower Stabilizers Lower Stabilizers Side hole is close to the finished edge Upper St...

Page 8: ...sure from each edge of the T Spacer to each unfinished edge B The measurement that is approximately 4 will be the BOTTOM 6c Repeat steps 6a 6b for the 2nd side of the inner gables Wheel is on the bott...

Page 9: ...both inner gables BELOW the drawer slide Identifying the Lower Stabilizer The screw hole is at the top close to the finished edge IMPORTANT Finished edge If you have any difficulty tightening the JCB...

Page 10: ...8 Estimated Time 5 minutes Using JCB connectors attach each upper stabilizer B3 one at a time to both inner gables B3 Upper Stabilizer The screw hole is closest to the lower unfinished edge Top edge F...

Page 11: ...Page 11 of 20 STEP 9 Estimated Time 10 minutes Attach one outer gable B1 to stabilizers with JCB connectors B1 B1...

Page 12: ...head Screw 10a 10b 10b Secure the other flat end of the metal brackets to U channel Position the flat end of the metal brace under the hole on the BOTTOM edge of the U channel Push the outer gable tow...

Page 13: ...wooden slats out across the inner stabilizers STEP 11 Estimated Time 5 minutes 11a 11b Slide the slats into the wide spaces of the metal U channel B6 on one outer gable Remember that one set of metal...

Page 14: ...JCB connectors but don t fully tighten 12a 12b Ensure the slats are set inside the u channel and that they haven t pulled out of the first outer gable 12c Firmly tighten the connectors This Step easi...

Page 15: ...12 DS 0415W L Plywood Drawer Back 12 DK 4100W unfinished Right Drawer Side 12 DS 0415W R Plywood Drawer Bottom 12 DB 4100 Unfinished D5 D1 D4 D3 D4 D3 D2 D5 D1 STEP 14 Estimated Time 5 minutes PER DR...

Page 16: ...ts 14b D1 ONLINE HELP To see a video showing how the cam and connectors work please visit our website www prepacmfg com support assemblyvideos html 1 Hi Lo Screws b n t Parts Identifica ion Ca i e t 1...

Page 17: ...Attach drawer front and tighten cams using a flat head screwdriver Locked Turn 210 Unlocked Left Drawer Side Right Drawer Side Unlocked Locked Turn 210 14e Turn drawer upside down and slide drawer bo...

Page 18: ...ls per drawer C Groove on drawer front Position the Stabilizer in the center of the drawer and insert it into the groove on the drawer front This is the same groove that you inserted the drawer bottom...

Page 19: ...Page 19 of 20 14h Attach drawer slides to left and right drawer sides using drawer slide screws Right Drawer Side Left Drawer Side Drawer Slide Screws Drawer Slide Screws...

Page 20: ...ur products A Our products are made from durable composite woods with a laminate finish and therefore should not be painted or varnished Q Are they waterproof A NO If liquid is spilled and quickly wip...

Reviews: