background image

Installation  and  service  of  this  product  should  be  conducted  by  a  trained 
personnel to avoid bodily injury from electric shock or heavy object

Observe  ESD  (Electrostatic  Discharge)  practices  during  integration  to  avoid 
possible damage to the board and / or other components

 
 
 
 
 

 

 

 

DSS224J-S3 Quick Guide 

Version 1.10 

 2017.05.24 

 

 
 
 

1.

 

 Check the Content

 

of the box. Please confirm that 

your package contains the following:

 

#  Description 

Image / Description 

Qty 

DSS224J-S3 
Enclosure 

 

1  

Bezel 

 

Opt. 

Fix mount rail set 

 

1 set 

Slide Rail Kit + Screws 

 Opt. 

Power Cable* 

 

Serial Cable* 

 

This Quick Guide 

 

Packaging 

 

1 set 

* Inside the accessories box. Box may consist of screw sets for rail kit or 
drives. If any items are missing, please contact your reseller or sales rep. 

 

2.

 

Get Familiar with the Unit.

 

DSS224J-

S3  features  24x  2.5”  SAS  hot

-swap  HDD  bays  with 

SAS/SATA  interposer  support,  dual  12Gbps  SAS  expanders, 
550W  1+1  redundant  power  supply  unit,  80Plus  Platinum 
efficiency, 4x 80mm easy swap PWM fan modules. 
Management  choice  of  RS232  mini  jack  for  CLI  or  Gigabit 
Ethernet management port for telnet, SSH, Web GUI, SNMP. 

 

Front view of the unit

  

24x Drive Bay

Drive Status LED:

(Solid) Drive Error

(Solid) Drive Online
(Blink) Drive Access

Power Button / LED:

System Status LED:

System Healthy

System On
System Off

ID Button / LED:

ID On
ID Off

System Degraded

(Blink)

Alarm Mute Button

Front Panel

Handle

Handle

 

 

Rear view of the unit 

PSU 2

PSU Status LED:

Power on
Power loss 

PSU 1

Primary Expander Module 

(with Network Management)

Secondary Expander Module

Fan 1 (back)

Fan 3 (front)

Fan 2 (back)

Fan 4 (front)

 

 

Expander Module 

 

 

 
 
 

3.

 

Install 2.5” Drives

 

to the enclosure as illustrated. It is 

suggested  to  install  HDDs  after  the  unit  is  mounted  to  the 
rack. 

 

 

4. 

Mounting the Unit using Fix Mount Rail  

When using the default fix mount rail provided with the unit, 
remove the rail from the unit before following the instruction 
below:

 

 

4a.

 

Prepare the Post

 

by installing square nuts. 

Front

1U

2U

Rear

1U

2U

 

 

4b.

 

Mount the Unit

 

to the rack. 

1. Install the fix mount rail to the rear posts

2. Slide the unit to meet the fix mount rail

3. Secure the unit and fix mount 

rail to the posts

1

2

3

1

2

3

 

 

5. 

Mounting the Unit using Tool-less Rail  

If  an  optional  slide  rail  kit  is  used,  follow  carefully  the 
instruction below on how to use it to mount the unit to the 
rack. 

 

5a.

 

Remove  Fix  Mount  Rail  Covers

 

from  the 

system. 

 

Thank you for your purchase of Premio DSS224J-S3 JBOD Storage System!

 

 

Reviews: