background image

Owner’s manual

 

Page 8/14

 

20220816 

Phosphorus removal unit (DpEC) 

 

Item # 339921 

 

4.

 

Electrical Wiring 

All electrical connexions must be performed by a certified electrician and according to local regulation. Using seal connectors and 
junction boxes is mandatory. 
 
Use four (4) separate circuit-breakers, two to operate the control panel, one to connect the alarm box and the last one for TLP-FAS 
when required. No other household appliance should be connected to these circuit-breakers. They must be used exclusively for the 
pump and the alarm box. 
 
The following diagram shows the electrical connections to be made to a treatment system with phosphorus removal unit (DpEC) + 
watertight sand filter. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Summary of Contents for REWATEC Phosphorus removal unit

Page 1: ...Owner s manual Phosphorus removal Certified to BNQ standard NQ 3680 910 2022 Certified to CAN BNQ standard 3680 600...

Page 2: ......

Page 3: ...ed with a watertight sand filter it is an NQ 3680 910 and CAN BNQ 3680 600 certified disinfection system This document contains information concerning the operating guidelines the maintenance as well...

Page 4: ...treatment systems designed by Premier Tech are a technological advancement based on phosphorus removal by electrocoagulation This technology specially developed to treat wastewater from onsite applica...

Page 5: ...odes During system operation the wastewater is mixed with aluminium particles freed from the electrodes The aluminium charged effluent from the reaction zone then transfers freely to the separation zo...

Page 6: ...inuous or intermittent use without requiring any special precautions and without any impact on the quality of the treatment The owner has no particular action to make to bring the system into operatio...

Page 7: ...coffee beans cigarette butts sanitary napkins tampons condoms cotton swab etc It is important that anyone using or maintaining the septic installation or property installer landscaper owner snow remo...

Page 8: ...e system can be postponed No request for delayed start up will be accepted any later than one 1 year after the purchase date without this affecting the product s warranties 2 4 Start Up Upon the compl...

Page 9: ...eatment system There must be a follow up with the proper verifications The TEST button allows you to check if the alarm system is working properly During a test the red indicator should light up and a...

Page 10: ...es is mandatory Use four 4 separate circuit breakers two to operate the control panel one to connect the alarm box and the last one for TLP FAS when required No other household appliance should be con...

Page 11: ...recommend that you keep all invoices and documents returned to you as proof of the regular maintenance of your system 5 1 Primary reactor The pumping out of the primary reactor must be performed when...

Page 12: ...n and phosphorous removal must at least once per 6 month period have a sample of the system s effluent analyzed to determine the concentration if any of fecal coliforms or total phosphorous The owner...

Page 13: ...time of publication Premier Tech Ltd makes no warranties or representations as to its accuracy Because of its continuous improvement policy Premier Tech Ltd and its affiliated companies reserve the ri...

Page 14: ...ech or by a qualified third party as referred to in section 1x 2 of the Regulation respecting waste water disposal systems for isolated dwellings Q 2 r 22 h Any damage or problem caused by an omission...

Page 15: ...r the Customer s Successors to cover the cost of the inspection 10 INTERPRETATION The terms and conditions of this warranty shall be interpreted according to and governed by the provisions of this war...

Page 16: ...I hereby declare that the residence serviced by a Premier Tech treatment system located at the above address changed ownership on this date If you are the PREVIOUS owner I have provided the system s O...

Reviews: