background image

Part No. 

Description 

Qty. 

653-072 

Direct Bury Post 

516-058 

3/8”x1-1/2” Hex Head Bolt 

516-028 

3/8” SS Nylock Nut 

516-023 

3/8” SS Flat Washer 

99DBKIT 

Assembly Instructions 

1  With a post hole auger drill a hole in the ground 30” deep in the desired location. 
2  Drill out the holes in the mounting plate of the post with a 7/16” dia. drill bit. Also drill out the holes in the 

mounting plate of the garbage receptacle base. 

Place the direct bury post into the center of the ground hole and support it in place. Make sure that the top 
of the post is level. If the top mounting plate is not level, the receptacle will not stand straight. The base of 
the receptacle can be installed to the post prior to securing the post in the ground hole. If the base is in-
stalled to the post you may have to clean concrete from the base after filling the hole. 

(Note: The distance 

between the ground and the bottom of the receptacle is your choice. You need to leave enough room to 
install the fasteners.) 

4  Fill the hole with concrete after the post is leveled. We suggest that you fill the hole slightly higher then 

ground level and crown the top of the concrete so that water doesn’t pool under the receptacle. 

5  After the concrete has set you can continue with the receptacle installation. 

Periodic check of bolt tightness recommended. 

30

33

1

2

Ø28

12

DIRECT BURY KIT 

FOR ALL RECEPTACLES

(

ROUND RECEPTACLE SHOWN

)

In Accordance to California law: WARNING This product contains a chemical known to the State of California to cause cancer and birth defects or 
other reproductive harm.