Assembly Instructions, Power Rail P6 (Version 2, Rev A)
7
RAD End Clamps are used on the outer Modules.
Insert the 5/16” RAD Bolt into Power Rail and rotate
90-degrees clockwise to lock the RAD Bolt within the
Power Rail. Secure with 5/16” Flange Nut.
Torque to
14-16 ft.-lbs.
AMP Clamp bonding Mid Clamps are inserted into the
Power Rail and positioned between adjacent Modules.
Insert the 5/16” RAD Bolt into Power Rail and rotate
4 Install the Modules
(cont.)
90-degrees clockwise to lock the RAD Bolt within the
Power Rail. Push Modules against AMP Clamp. Tight-
en 5/16” Flange Nut.
Torque to 14-16 ft.-lbs.
NOTE
The RAD bolts
used in the AMP
Clamps and End
Clamps must
be locked into
the channel by
rotating clockwise
90-degrees. Use
the indicator slot on
the threaded end
to identify whether
or not the bolt has
been locked.