Diverging Lat Pulldown Assembly Guide: Routing the Cable Assembly
9
The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
To route the cable on the movement frame:
1.
Screw both ends of the upper cable into the cable ends located on the
movement arms. Using a
³₄
-inch wrench, tighten to 600 in-lb (68 N-m) of
torque.
Figure 11: Upper cable route
2.
Check that the lower cable is properly routed on the lower pulley.
Figure 12: Lower cable route
Routing the Cable Assembly
Summary of Contents for Discovery DSL0314
Page 1: ... למוצרי הפעלה מדריך Discovery Series Selectorized Line ...
Page 2: ......
Page 44: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 42 הערות ...
Page 45: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 43 הערות ...
Page 46: ... למוצרי הפעלה מדריך Discovery Selectorized Line הערות 44 הערות ...
Page 47: ......
Page 49: ...Assembly Guide Discovery Series Selectorized Line Diverging Lat Pulldown ...
Page 50: ......
Page 67: ......