CW-411 Assembly Guide
page 6
1
Preparations
Preparations
The CW-411 parts are inspected before shipment.
Each unit contains several pieces that require
assembly. You will need to obtain adult assistance
during the assembly process.
Unpacking the Equipment
When you open a box, carefully unpack the pieces and
lay them on the floor near the location where you plan
to use them.
CAUTION: Be careful when you remove the
packaging material with a utility knife. Do not cut
the upholstery or scratch the paint.
If any items are missing, contact the dealer from whom
you purchased the unit. For more information, refer to
Obtaining Service
.
Required Tools
Tools that you need to obtain before assembling the
unit include:
❏
Wire cutter or utility knife
❏
¾-inch open-end wrench
❏
3
⁄
32
-inch Allen wrench
Installation Requirements
Follow these installation requirements when
assembling the unit:
•
Review the
Important Safety Guidelines for
Owners
.
•
Assemble the unit where it will be used
.
Provide ample space around the unit.
•
Install components in the sequence shown.
•
Insert all fasteners in the same direction
.
For aesthetic purposes, insert all the fasteners
in the same direction unless specified (in text or
illustrations) to do otherwise.
•
Leave room for adjustments.
Tighten the
fasteners to keep the unit stable, but leave room
for adjustments. Do not fully tighten fasteners until
instructed to do so.
Summary of Contents for CW-411
Page 1: ...CW 411 ...
Page 2: ......
Page 14: ...CW 411 Assembly Guide page 14 Notes ...
Page 15: ...CW 411 Assembly Guide page 15 Notes ...
Page 17: ...General Safety Maintenance Manual Precor Icarian Line Commercial Strength Equipment ...
Page 18: ......
Page 46: ...General Safety and Maintenance Manual Recommended Maintenance Checklist 28 Notes ...
Page 47: ......