CW-119 Assembly Guide
page 5
1
Preparations
Preparations
The CW-119 parts are inspected before shipment.
Each unit contains several pieces that require
assembly. You must obtain adult assistance during the
assembly process.
Unpacking the Equipment
When you open the box, carefully unpack the pieces
and lay them on the floor near the location where you
plan to use them.
CAUTION: Be careful when you remove the
packaging material with a utility knife. Do not cut
the upholstery or scratch the paint.
If any items are missing, contact the dealer from whom
you purchased the unit. For more information, refer to
Obtaining Service
.
Required Tools
Tools that you need to obtain before assembling the
unit include:
❏
Wire cutter or utility knife
❏
SAE hex key set
Installation Requirements
Follow these installation requirements when
assembling the unit:
• Review the
Important Safety Instructions
.
• Assemble the unit where it will be used
.
• Provide ample space around the unit.
Open
space around the equipment allows for easier
access.
• Install components in the sequence shown.
• Set up the equipment on a solid, flat and level
surface.
A smooth, flat surface under the unit
helps keep it level.
• Insert all fasteners in the same direction
.
For aesthetic purposes, insert all the fasteners
in the same direction unless instructed (in text or
illustrations) to do otherwise.
• Leave room for adjustments.
Tighten the
fasteners to keep the unit stable, but leave room
for adjustments. Do not fully tighten fasteners until
instructed to do so.
Summary of Contents for CW-119
Page 1: ...CW 119 ...
Page 2: ......
Page 11: ...CW 119 Assembly Guide Notes ...
Page 13: ...General Safety Maintenance Manual Precor Icarian Line Commercial Strength Equipment ...
Page 14: ......
Page 42: ...General Safety and Maintenance Manual Recommended Maintenance Checklist 28 Notes ...
Page 43: ......