PD8-6060 Explosion-Proof Dual Analog Input Process Meter
Instruction Manual
23
EU Declaration of
Conformity
EU Declaration of Conformity is available in the
Documentation CD provided with the product under
the
EU DoC
menu.
Safety Information
•
Read complete instructions prior to installation
and operation of the meter.
•
Risk of electric shock or personal injury.
•
Hazardous voltages exist within enclosure.
Installation and service should be performed only
by trained service personnel.
Installation
Install in accordance with applicable local and
national regulations (e.g. NEC).
For Installation in USA
The ProtEX-MAX must be installed in accordance
with the National Electrical Code (NEC) NFPA
70.
For Installation in Canada
The ProtEX-MAX must be installed in accordance
with the Canadian Electrical Code CSA 22.1. All
power supplies below 36 V and input circuits
must be derived from a CSA Approved Class 2
source.
For European Community
The ProtEX-MAX must be installed in accordance
with the ATEX directive 94/9/EC and the product
certificate Sira 12ATEX1182.
•
Disconnect from supply before opening
enclosure.
•
Keep cover tight while circuits are live.
•
Conduit seals must be installed within 18"
(450mm) of the enclosure or within 2" (50mm)
for Zone installations.
Wiring connectors are accessed by opening the
enclosure. To access electrical connectors,
remove the 2 captive screws and then remove
the electronics module. Connectors are on the
rear of the electronics module.
Unpacking
Remove the meter from box. Inspect the
packaging and contents for damage. Report
damages, if any, to the carrier.
If any part is missing or the meter malfunctions,
please contact your supplier or the factory for
assistance.
Pre-Installed Conduit Plugs
The ProtEX-MAX is supplied with two pre-installed
conduit plugs for installations that do not require the
use of all four conduit entries. The conduit/stopping
plugs include an internal hexagonal socket recess for
removal. The conduit plugs and their factory
installation are included in all hazardous area
approvals of this product.
•
In hazardous areas, conduit and conduit/stopping
plugs require the application of non-setting (solvent
free) thread sealant. It is critical that all relevant
hazardous area guidelines be followed for the
installation or replacement of conduit or plugs.
Cover Jam Screw
The cover jam screw should be properly installed
once the meter has been wired and tested in a safe
environment. The cover jam screw is intended to
prevent the removal of the meter cover in a
hazardous environment without the use of tools.
Using a M2 hex wrench, turn the screw clockwise until
the screw contacts the meter. Turn the screw an
additional 1/4 to 1/2 turn to secure the cover.
•
Excess torque may damage the threads and/or
wrench.