PreciseLED STUD 3

Recessed Drywall Mount 

Installation Instructions

 

STUD 3

’’

 Linear LED 

      52 Railroad Ave                                                       

www.preciseled.com

                       

      Valley Stream, NY 11580                                             [email protected]            

File Name: STUD3-2G INST A01    JAN. 5, 2018

We reserve the right to change specifications without prior notice.

2018

 

PreciseLED Inc. 

1

For your safety, read and understand instructions completely before starting 

Note: PreciseLED recessed fixtures are designed to meet the latest NEC requirements and are listed in full compliance 

with UL 1598. Before attempting installation of any recessed lighting fixture, check your local electrical building code. 

This code sets the wiring standards and installation requirements for your locality and should be understood before 

starting work. If fixture is to be switch from wall switch or dimmer, make sure black supply wire properly connected to 

switch or dimmer (follow switch/dimmer instructions). 

WARNING: 

1. Before wiring to power supply, turn off electricity at the fuse or circuit break box.

2. Insulation may be placed in direct contact with ANY part of the fixture. 

3. Always have installation performed by a licensed electrician. 

FIXTURE INSTALLATION

1. Extend bar hangers to fit between joists. Bar hanger foot is contoured to easily align with          

bottom of joist (Fig.1). Position fixture by hammering Real-Nails into joists (Fig.2). 

    (Note: Bar hanger may be shortened to fit 12’’ framing or smaller by breaking at score lines). 

2. Slide fixture along bar hangers into desired location. Use locking screw or slot to secure(Fig.3). 

    Relocating fixture- Nail can be removed with hammer claw to allow easy repositioning of fixture

    without damaging bar hanger or nail. 

3. Follow steps 1-4 under Electrical Connection. 

4. When installing in drywall, cut appropriate sized hole. After installing drywall, if necessary,      

    adjust fixture for ceiling thickness by loosening hex screws that attach the round housing to the     

    plaster frame. 

1

1.Ensure the power to the fixture’s circuit is turned off. 

Remove optics (A) by the provided tool. 

2.  Open the screw tabs (D) (DO NOT remove the tabs) on 

the LED module, and uncrew the screws (C)

2

PART LIST 
A Optics  

 

 

G Wire nuts(By others)

B LED module    

 

H BX connector nut 

C LED module screws    

I drywall anchor/ 1/4-20 

D Screw tab 

 

 

scrwes (by others) 

E BX cable (by others)   

J Spackle flange 

F BX knockout plate    

K Plaster and paint

3.  Disconnect the LED module wires and remove the LED 

module (B) to get access to the wires. 

3

Drywall Opening Dimensions

Reviews: