![PreciseLED STUD 3](http://html1.mh-extra.com/html/preciseled/stud-3-linear-led/stud-3-linear-led_installation-instructions_1593897001.webp)
Recessed Drywall Mount
Installation Instructions
STUD 3
’’
Linear LED
52 Railroad Ave
www.preciseled.com
Valley Stream, NY 11580 [email protected]
File Name: STUD3-2G INST A01 JAN. 5, 2018
We reserve the right to change specifications without prior notice.
2018
PreciseLED Inc.
1
For your safety, read and understand instructions completely before starting
Note: PreciseLED recessed fixtures are designed to meet the latest NEC requirements and are listed in full compliance
with UL 1598. Before attempting installation of any recessed lighting fixture, check your local electrical building code.
This code sets the wiring standards and installation requirements for your locality and should be understood before
starting work. If fixture is to be switch from wall switch or dimmer, make sure black supply wire properly connected to
switch or dimmer (follow switch/dimmer instructions).
WARNING:
1. Before wiring to power supply, turn off electricity at the fuse or circuit break box.
2. Insulation may be placed in direct contact with ANY part of the fixture.
3. Always have installation performed by a licensed electrician.
FIXTURE INSTALLATION
1. Extend bar hangers to fit between joists. Bar hanger foot is contoured to easily align with
bottom of joist (Fig.1). Position fixture by hammering Real-Nails into joists (Fig.2).
(Note: Bar hanger may be shortened to fit 12’’ framing or smaller by breaking at score lines).
2. Slide fixture along bar hangers into desired location. Use locking screw or slot to secure(Fig.3).
Relocating fixture- Nail can be removed with hammer claw to allow easy repositioning of fixture
without damaging bar hanger or nail.
3. Follow steps 1-4 under Electrical Connection.
4. When installing in drywall, cut appropriate sized hole. After installing drywall, if necessary,
adjust fixture for ceiling thickness by loosening hex screws that attach the round housing to the
plaster frame.
1
1.Ensure the power to the fixture’s circuit is turned off.
Remove optics (A) by the provided tool.
2. Open the screw tabs (D) (DO NOT remove the tabs) on
the LED module, and uncrew the screws (C)
2
PART LIST
A Optics
G Wire nuts(By others)
B LED module
H BX connector nut
C LED module screws
I drywall anchor/ 1/4-20
D Screw tab
scrwes (by others)
E BX cable (by others)
J Spackle flange
F BX knockout plate
K Plaster and paint
3. Disconnect the LED module wires and remove the LED
module (B) to get access to the wires.
3
Drywall Opening Dimensions