PPS25 Electronic Memory Gauge
User Manual
Pioneer Petrotech Services Inc.
1-888-PP-GAUGE (774-2843)
www.pioneerps.com
Page 12
4.7
Assembling Battery Housing
For more information about replacing o-rings and backup rings, cleaning buffer
oil tube, check battery housings; please see “
5.1 Field
Maintenance
” for details.
To install battery housing:
(1)
Check the metal C-ring (if available);
(2)
Apply grease on the O-rings;
(3)
Apply anti-seize compound on the threads for high temperature applications;
(4)
Once completed, close the battery housing on each tool;
(5)
Using a torque wrench and an open-end wrench assemble the battery housing with the
gauge (Fig 10). Torque all connections to 70ft-Ibs;
(6)
Using a torque wrench and an open-end wrench to assemble the bullnose with the gauge at
70ft-Ibs.
The size of wrenches is dependent on OD size of the PPS25 gauge that you are
assembling. For information about wrench size, please see “
Appendix C:
Accessories
” for details.
Fig. 10
Before assembling battery housing with the gauge, please check:
If the metal C-ring (if available) needs to be replaced;
If the o-rings and backup rings on the gauge need to be replaced;
If the buffer oil tube needs to be cleaned;
If the battery housing is in good condition.
If the metal-to-metal seal ring for the battery housings is used, each battery
housing connection to the gauge must be torqued to 90ft-Ibs in order to
properly energize this seal ring.
Now, your gauge is ready for an operation!