PPS25 Electronic Memory Gauge
User Manual
Pioneer Petrotech Services Inc.
1-888-PP-GAUGE (774-2843)
www.pioneerps.com
Page 11
4.6
Installing Battery Pack
All battery packs are supplied by PPS in various configurations for different temperature
requirements. Typical battery packs are with maximum working temperatures of 85
°
C
、
150
°
C
、
165
°
C and 180
°
C respectively.
Please see
Appendix C: Accessories
for details.
To install a battery pack:
(1)
Remove the battery housing from the gauge.
(2)
Connect the battery pack to the gauge. The battery pack has only one way of alignment with
the gauge connector so as to minimize potential damage. Align the lug on the battery pack
with the slot on the gauge connector.
You may consider installing batteries in both gauges (one set) at the
same time, as you need to try and to initiate both gauges at once (this
process will avoid the process of synchronizing the files when they are
retrieved from the tools), and then write down the date and time the
batteries were plugged to the gauges into the Gauges Control Sheet
(PPS25.xls).
(
(
3
3
)
)
Watch the LED on the battery pack after the connection is made. The LED will flash 16 times
indicating that the gauge has been initialized to start working (Fig. 9)
(
(
4
4
)
)
Document all information for each well in Gauge Control Sheet (PPS25.xls). The exact date
and time when the batteries were connected to each gauge must be documented.
Fig. 9
It may take a few seconds (1-3 seconds) for the LED on the battery
pack to start flashing after the battery pack is inserted into the gauge.