Please be 

sure to the enough 

lubricant 

on parts. Daub the 

lubricant 

on the 

load 

hook (12)

cable 

drum 

shaft, slow down box, and bearing every half a year. 

 

 

Please 

daub the 

lubricant 

on 

the nesting 

of cable drum shaft when replace 

the 

steel cable 

(7) every 

time. Immediately replace the 

cable if damaged.

 

 

Please perform any rework and maintenance tasks only if the power plug is disconnected. 

 

Please inspect the device for transportation damages. Immediately report any possible 
damages to your seller

.

 

8  INSTALLATION 

 

Install the cable hoist on a steel beam (Fig 2). Use only the enclosed installation brackets 
(1) which can be attached to the top of the mounting casing (3) using the screws, washers 
and spring lock washers. The steel beam must be able to withstand at least double the 
rated weight of the machine. Contact a professional installer for best results. 

 

The steel beam must have the following dimension: 46 x 46 mm, a wall thickness of at 
least 2.3 mm and a length of at least 450 mm (Fig 1). 

 

The steel beam must be securely anchored in a wall. The anchor must be installed 
correspondingly sturdy in order to be able to withstand the load. 

 

Please be sure that the machine is installed level and not slanted.  

 

The remote control (14) must be easily accessible at all times and must therefore be 
installed at a distance to the floor of between 0.8 m and 1.5 m (Fig 3). 

 

Insert the load hook (12) into the hook bracket (5) of the mounting casing (3) when using 
the load hook with pulley (13). 

 

The electric pulley will be attached at the top. Attach the pulley with bearer frame on the 
crossbar. The girder is then attached to the support columns. The support columns must 
be, in accordance with the requirements of the customer, properly secured on the working 
area. The support columns must be installed to be sturdy and stable. Also be able to 
withstand a nominal load long-term. 

9  OPERATION 

 

Prior to starting work, please be sure that the steel cable (7) is wound up exactly, layer 
next to layer on the cable spool (6). Never unwind the cable completely!  

 

Unwind the cable only to the point that at least 3 more layers are located on the drum. 

 

If the red indicator mark is visible, please stop the cable hoist immediately and do not 
continue to unwind the cable! 

 

Always wind the cable as shown in Fig. 4. 

Note: When replace the wire rope, be sure to pull rope into the square hole 
of  rope  drum,  and  then pull  it  out  from  the  round  hole.  With  that  wind  the 
rope two circles and then pull it to the edge which is side of rope drum and 
fix it. 

 

The cable hoist is operated using the remote control (14). When operating the upper 
position of the switch, the load is hoisted up. When operating the lower position, the load 
is lowered. Never switch directly from hoisting to lowering or vice versa. Always stop the 
cable hoist prior to changing directions. 

 

Operate the Emergency switch (15) to immediately stop the cable hoist in case of an 
emergency and to secure against restart. To reset the device to operational status, first 
turn the Emergency switch (15) clockwise, which will unlock the Emergency switch (15). 
The cable hoist is now operational. 

 

 

Summary of Contents for POWX900

Page 1: ...y 3 5 3 Personal safety 3 5 4 Power tool use and care 4 5 5 Service 4 6 EXTRA SAFTY INFORMATION 4 7 BEFORE EVERY USE 5 8 INSTALLATION 6 9 OPERATION 6 9 1 Intermittent rating 7 9 2 Overload Only for PO...

Page 2: ...switch Up Down 17 Power cord 3 PACKAGE CONTENT LIST Remove all packaging materials Remove remaining packing and package inserts if included Check that the package contents are complete Check the appl...

Page 3: ...he power tool Keep the cord away from heat oil sharp edges or moving parts Damaged or entangled cords increase the risk of an electric shock When operating a power tool outdoors use an extension cable...

Page 4: ...ies and cutting tools etc in accordance with these instructions and in the manner intended for the particular type of power tool taking into account the working conditions and the work which needs to...

Page 5: ...in operation do not carry out any repairs or inspections It is prohibited to change any part of the pulley or to disassemble it Depending on the frequency of use after 20 hours of total operation or...

Page 6: ...casing 3 when using the load hook with pulley 13 The electric pulley will be attached at the top Attach the pulley with bearer frame on the crossbar The girder is then attached to the support columns...

Page 7: ...r water damage The cable hoist uses a single phase energy power supply The nominal voltage is 230V 20 the nominal frequency is 50Hz 1 The motor must be safely grounded In the circuitry of the power su...

Page 8: ...eel cable 7 for damages as well as the functionality of the limit bracket Wind cable hoist until the stopper 10 activates the limit bracket of the micro switch If the steel cable 7 is damaged split or...

Page 9: ...oo small 2 The capacitor has become damaged 3 The brake is not completely open 1 Adjust the work depending on the power supply 2 Change power supply 3 Allow the machine to be repaired from a qualified...

Page 10: ...netration intentional damage on purpose or by gross carelessness inappropriate usage use for purposes for which the device is not suitable incompetent usage e g not following the instructions given in...

Page 11: ...ards Any unauthorized modification of the apparatus voids this declaration European Directives including if applicable their amendments up to the date of signature 2014 30 EU 2006 42 EC 2011 65 EU Eur...

Reviews: