Installation / Initial Set-
Up (cont’d)
11
There are a number of important steps required to set up your generator for initial use. These steps are:
Steps for Installation / Initial Set-Up
1.
Unpacking & delivery inspection.
2.
Planning the power load to stay within the generator’s rated capacity.
3.
Propane hook-up.
4.
Setting up generator for the type of power generation you need:
a.
portable power source, or
b.
connect to a building as a back-up power source.
5.
Selecting a site for using the generator.
6.
Grounding the generator.
7.
Battery installation.
8.
Wheel kit assembly.
9.
Propane tank connection.
Each of these steps is discussed in detail below:
1. Unpacking & Delivery Inspection
You should inspect the generator immediately after you receive delivery.
See the “Machine Component Identification” section of this manual for a diagram of the gene
rator and
its components.
•
If you are
missing
or have damaged components, contact Product Support at 1-866-443-2576.