(943) 9200 GB SICHERUNG
GB
OVERLOAD SAFETY
- 15 -
Shear bolts
The ploughing components are fastened with shear bolts.
When overloaded the shear bolts break (30) and the ploughing component swings away and up.
- Remove the rest of the shear bolt.
- Loosen hexagonal bolt (31).
- Swing ploughing component back into the working position.
- Insert new shear screws and retighten both bolts.
Take note!
Only use genuine shear bolts (see spare parts list) with the corresponding dimension and quality. Under no circumstances
use bolts with greater or lesser strength.