GB
- -
0000-gb anbau_877
CONNECTiNg TO TraCTOr
Preparing the tractor
Ballast weight:
Observe Safety points in Supplement!
Lifting gear
- The left and right lifting struts (4) must be the same length.
Adjust using adjuster ().
- If lifting struts (4) can be pinned at various positions on the lower
links, then select the back position (H). In doing this, the tractor’s
hydraulics will not be so greatly overloaded.
- Pin (2) upper link (1) in accordance with the manufacturer’s
specifications.
- Secure lower links with struts (5) so that attached implement cannot
swing out during transportation.
Preparing the implement
Mounting axle
Install correct mounting bar on tractor’s lifting gear which corresponds
to the connecting size (Category II or III). See Spare Parts List also.
Upper link
- Position upper link (1) so that the attachment point (P1) on the
implement during operation is somewhat higher than the attachment
point (P2) on the tractor.
Connect drive shaft
- Check drive shaft length and adapt if necessary before initial
operation.
See chapter "Drive Shaft" in Supplement B also.
Track loosener (Optional equipment)
Only use track loosener when working on ploughed ground!
TD65/92/2
1
P1
P2