- 23 -
0600_GB-Aufbauoberteil_5543
GB
4. Screw side panel with holder (S)
5. Mount the guide plate (L)
- fix with linch pin (K)
6. Install tarpaulin (8) with linch pin (1).
7. Connect top ropes
Assembling the top frame section
• It is imperative that the machine stand horizontally and
that two people carry out this modification.
• Danger of injury!
1. Swing upper railing () up
2. Swing lower railing (a) up
. Swing front side wall up
- left and right
TD 5/1/
56
Attention!
• It is imperative
that the machine
stand horizontally
and that two
people carry out
this modification.
• Danger of injury!
Note!
When the dry
forage extension
is up, the rear
tarpaulin (8)
must be removed
when using
the regulating
rollers otherwise
damage could
occur to the
tarpaulin.
ToP fraMe secTion