- 21 -
0700_gb-Dosierer_548
GB
regulaTing rollers
1. Open trailer tailgate.
2. Relax chain tension (58) and take off drive
chain (1).
3. Remove metal plates (2) left and right.
Take care!
Do not after the torque pre-tensioning (X)
4. Dismantling Upper Regulating Roller
remove the following screws, left and right:
- three screws (SK-) on the flange bearing
- two screws (SK-2) on the guard ring
5. Dismantling the Lower Regulating Roller
remove two screws (SK-2) on the guard ring, left and
right
6. Slide regulating rollers backwards.
7. Re-fit metal plates (2) left and right again.
8. Adjusting the switch
- see next page
Removal of regulating rollers
Take care!
Do not reach into
regulating rollers
area while drive
motor is still
running.