Dokument
D
GB-0600 Dokum D Anhänger
-
ALOIS PÖTTINGER Maschinenfabrik GmbH
A-4710 Grieskirchen
Tel. (07248) 600 -0
Telefax (07248) 600-511
GEBR. PÖTTINGER GMBH
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-111 / 112
Telefax (0 81 91) 92 99-188
GEBR. PÖTTINGER GMBH
Servicezentrum
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-10 / 21
Telefax (0 81 91) 59 656
Machine checked according to delivery note. All
attached parts removed. All safety equipment, drive
shaft and operating devices at hand.
Operation and maintenance of machine and/or
implement according to operating instructions
explained to the customer.
Tyres checked re. correct pressure.
Wheel nuts checked re. tightness.
Drive shaft cut to correct lenght.
Correct power-take-off speed indicated.
Mechanical functions (opening of rear gate, pivoting
of cutting mechanism out/in, etc.) demonstrated and
explained.
Removing and mounting of knives explained.
Electrical connection to tractor established and
checked re. correct supply (54 g connected). Note
references in operating manual.
Fitting to tractor carried out: hight of drawbar
adjusted, brake cable installed, hand brake lever
assembled in tractor cabin.
Please check.
X
According to the product liability please check the above mentioned items.
INSTRUCTIONS FOR
PRODUCT DELIVERY
GB
Function of electrical installation checked and
explained.
Hydraulic connection to tractor established and
checked re. correct supply.
Hydraulic functions (drawbar, opening of rear gate, etc.)
demonstrated and explained.
Handbrake and operating brake tested re. function.
Trial run carried out and no defects found.
Functions explained during trial run.
Automatic on/off switch of loading mechanism
checked.
Pivoting in transporting and operating position
explained.
Information given re. optional extras.
Absolute need to read the operating manual indicated.
In order to prove that the machine and the operating manual have been properly delivered, a confirmation is necessary.
For this purpose please do the following:
-
sign the
document A
and send it to the company Pöttinger
(in case of Landsberg equipment: to the company Landsberg)
-
document B
stays with the specialist factory delivering the machine.
-
document C
stays with the customer.