- 10 -
9300_GB-HANDBREMSE_511
gB
BraKe unit (moVeaBle hanDBraKe)
Initial operation
With initial operation install accompanying catch bracket
(12) onto mudguard so that it is within reach and can be
seen.
Insert moveable hand break lever (1) onto tractor for
every run.
- Carry out brake test.
Shortening the bowden cable
The extra long brake cable is manufactured to suit the
various designs of different tractor types.
In order to guarantee optimal function of brake unit, the
cable (A) should run in a straight line if possible.
Adaption to tractor
- Loosen cable clamps (1) and unthread the cable through
the support (2).
- Shorten bowden cable covering (see diagram) to a
point where trouble-free cornering is still is possible.
- Rethread cable and secure with cable clamps.
- Check lever action (B) and adjust with hexagonal nut
() if necessary.
Brake adjustment
- If brake linings are worn out then brake shoes must be
adjusted. This is carried out by turning adjusting nut
() on hand brake lever.
Should the adjustment action on the hand brake lever no
longer be adequate, then with the help of the notches on
the brake cam axle lever, alter the position of the lever
(19) correspondingly.
The lever adjustment (19) must be carried
out on both sides simultaneously.
Attention!
If brake fault oc-
curs, immediately
stop tractor and
clear fault.