
9 Settings
9.1
List of parameters
See
Subject to system configuration, not all parameters listed in the
parameter list will be shown on the display.
To reach the end user (Eu), Commissioning (C) and Engineer
(E) setting levels:
1
.
Press the OK button.
2
.
Then press the information button for approx. 3 s.
3
.
Select the circuit using the control knob.
4
.
Confirm with the OK button.
Time of day and date
Prog. no.
Level Standard value
Hours / minutes
1
Eu
01:00 (h:min)
Day / month
2
Eu
01.01 (day.month)
Year
3
Eu
2030 (year)
Start of summertime
5
E
25.03 (day.month)
End of summertime
6
E
25.10 (day.month)
Operator section
Prog. no.
Level Standard value
Language
20
Eu
English
Info
Temporarily | Permanently
22
E
Temporarily
Contrast of display
25
Eu
—
Operation lock
Off | On
26
E
Off
Programming lock
Off | On
27
E
Off
Units
°C, bar | °F, PSI
29
Eu
°C, bar
Save basic settings
No | Yes
30
E
No
Activate basic settings
No | Yes
31
E
No
Used as
Room unit 1 | Room unit 2 | Room unit 3 | Operator unit 1 | Operator unit 2 |
Operator unit 3 | Service unit
40
C
Room unit 1
Assignment device 1
Heating circuit 1 |Heating circuits 1 and 2 |Heating circuits 1 and 3/P |All heating
circuits
42
C
Heating circuit 1
Jointly with HC1 | Independently
44
C
Jointly with HC1
Jointly with HC1 | Independently
46
C
Jointly with HC1
Room temperature device 1
Heating circuit 1 only | For all assigned HCs
47
C
For all assigned HCs
None | Heating circuit 1 | For all assigned HCs
48
C
For all assigned HCs
9 Settings
62
Paramount five 30 – 115
7703046 - 01 - 23072018