Danger
Danger to life by gas!
The entire gas pipe, particularly the joints must be checked for
leakages before commissioning.
6.4
Air supply/flue gas outlet connections
6.4.1
System certification
The system certification complies with Gas Appliances Directive
2016/426/EC, the rules of the DVGW VP 113 (German Technical and
Scientific Association for Gas and Water) and standard 15502-1. The joint
approval for the Potterton Commercial flue gas piping system with a
Potterton Commercial gas-fired condensing boiler is documented by the
corresponding CE product identification number. The CE number is
specified in the table of technical data (see reference).
No additional CE approval for the flue gas piping system is required.
For more information, see
Identifying the system certification
The Potterton Commercial flue gas piping system must be labelled
following the installation. Each basic kit for the Potterton Commercial flue
gas piping systems includes a sticker for the CE certification. The installed
flue gas piping system must be marked with a check on the sticker and
this must be attached close to the gas-fired condensing boiler.
6.4.2
Flue gas connection
For the operation of the Paramount as a gas condensing boiler, the flue
gas pipe should be designed with the flue gas temperature under 120°C
(flue gas pipe type B).
Important
The enclosed assembly instructions for the flue gas system have
to be observed.