
5.3.2
Notes for installation location
Danger
Danger caused by the boiler falling!
The boiler may fall as a result of unsuitable rawl plugs and a wall
that does not have sufficient load-bearing capacity.
Use suitable rawl plugs to secure the boiler.
The wall must have sufficient load-bearing capacity and be able
to bear the weight of the boiler.
The enclosed rawl plugs are suitable for use in a full brick wall.
Caution
Danger of damage from water!
The following must be observed when installing the Paramount:
In order to prevent damage due to water, particularly due to
leakages in the DHW storage tank, suitable precautionary
measures should be taken regarding installation.
Installation room
The installation room must be dry and frost-free.
The installation location has to be selected particularly with respect to
the routing of the flue gas pipes. When installing the boiler, the specified
wall clearances have to be maintained.
Along with the general rules of the technology, especially the regulations
of the federal German states, such as fire and construction ordinances
as well as heating room guidelines, must be observed. There should be
sufficient space in front of the equipment to carry out inspection and
maintenance work.
Caution
Danger of damaging the device!
Aggressive foreign substances in the combustion supply air can
destroy or damage the heat generator. Therefore the installation in
rooms with heavy dust accumulation is only allowed with
room air independent operating modes.
If the Paramount is operated in rooms in which solvents, cleaning
agents containing chlorine, paints, glues or similar substances are
worked with or in which such substances are stored, only room air
independent operation is permissible. This applies especially for
rooms in which ammonia and its compounds, nitrites and
sulphides are present (animal breeding and recycling facilities,
battery and galvanising rooms, etc.).
During the installation of the Paramount under these conditions
DIN 50929 (Corrosion probability of metallic materials with
external corrosion loading) as well as information sheet i. 158;
“German Copper Institute” is heeded.
For damages occurring due to the installation in an unsuitable location or
based on improper combustion air supply, there is no warranty claim.
5.3.3
Operation in bath and shower rooms
1 Protection area 1 (above bathtub)
2 Protection area 2
A Bath without fixed partition
B Shower tray without fixed partition
C Shower with fixed shower head and no fixed partition
Important
For showers without a tray, the dimension 120 cm is measured
horizontally from the fixed shower head or from the attached water
outlet; there is no area 2.
Fig.11
Clearances in bath and shower
rooms
RA-0000053
A
B
C
5 Before installation
7703046 - 01 - 23072018
Paramount five 30 – 115
35