
10 Maintenance
10.1 General
10.1.1 General instructions
According to EU Directive 2002/91/EC (Energy Performance of Buildings),
Article 8, boilers with a rated output from 20 to 100 kW should be regularly
inspected.
In heating and air conditioning systems, a regular inspection and
maintenance as required by qualified personnel contribute to correct
operation according to the product specification, and therefore to ensuring
high efficiency and low environmental pollution in the long term.
Danger of electric shock
Before any work, switch off the mains supply to the boiler!
Before removing parts of the casing, the boiler has to be de-
energised.
Work under voltage (removed casing) may only be carried out by
a trained electrician.
Danger
Risk of poisoning.
Never use condensate water as drinking water!
Condensate is not suitable for consumption by people or
animals.
Do not let the skin come into contact with condensate.
Suitable protective clothing must be worn during maintenance
work.
Caution
Only a qualified professional is authorised to clean the inside of
the boiler.
Cleaning of heating surfaces and burner should be carried out by the
approved installer. Before beginning work, the gas tap and the shut-off
valves of the heating water should be closed.
10.1.2 Inspection and service as required
Important
We recommend having the Paramount inspected annually.
If the need for maintenance work is found during inspection, this
should be carried out according to need.
Maintenance work includes:
Clean Paramount outside.
Checking the burner for contamination and, possibly, cleaning and
servicing.
Cleaning burner areas and heating surfaces
Replacing wear parts (see
Spare parts list
).
Caution
Only genuine spare parts may be used.
Checking connection and seal locations of water filled parts.
Check safety valves for correct function.
Check operating pressure and top up the water if necessary.
Vent the heating system.
Put the gravity lock back into operating position.
End control and documentation of service work performed.
10 Maintenance
7703046 - 01 - 23072018
Paramount five 30 – 115
139