
End user (Eu)
Commissioning, Engineer (menu
Status)
Home run
Standby
Standby
Tab.34 State table buffer storage tank
The following messages are possible under Buffer storage tank:
End user (Eu)
Commissioning, Engineer (menu
Status)
Hot
Hot
Frost protection active
Frost protection active
Charg el imm heater
El charg, emergency mode
El charg, source protection
Electric charging defrost
Electric charging, forced
Electric charging, substitute
Charging restricted
Charging locked
Restricted, DHW priority
Charging active
Forced charging active
Partial charging active
Recooling active
Recooling via collector
Recooling via DHW/HCs
Charged
Charged, max st tank temp
Charged, max charging temp
Charged, forced temp
Charged, required temp
Part charged, required temp
Charged, min charging temp
Cold
Cold
No request
No request
Tab.35 Status table swimming pool
The following messages are possible under Swimming pool:
End user (Eu)
Commissioning, Engineer (menu
Status)
Manual control active
Manual control active
Fault
Fault
Heating mode restricted
Heating mode source
Heated, max swi pool temp
Heated, max swi pool temp
Heated
Heated, setpoint solar
Heated, setpoint source
Heating mode
Heating mode solar off
Heating mode source off
Cold
Cold
9.2.25 Diagnostics caskade/heat generation/consumers
Diagnostics cascade/heat generation/consumers (8100-9058)
Displays of different setpoint and actual values, relay switching statuses
and counter statuses for diagnostics purposes.
9 Settings
136
Paramount five 30 – 115
7703046 - 01 - 23072018