
Service & Replacement of Parts - Page 23
4.7
Gas Valve
•
Gain General Access - See 4.1
1.
Remove burner assembly - See 4.6
2.
Disconnect gas valve lead.
3.
Unscrew pilot tube and thermocouple.
4.
Remove inlet and outlet plates.
5.
Re-assemble in reverse order.
6.
Check burner pressure and gas rate against the data
badge using the pressure test point and gas meter,
shown in Fig. 13.
4.8
Pilot Interrupter
•
Gain General Access - See 4.1
1.
Remove interrupter wires from overheat thermostat.
2.
Unscrew thermocouple.
3.
Re-assemble in reverse order.
4.9
Pilot Assembly
•
Gain General Access - See 4.1
1.
Unscrew igniter.
2.
Unscrew thermocouple and pilot tube.
3.
Remove 2 screws and remove pilot assembly.
4.
Re-assemble in reverse order.
4.10 Burner
•
Gain General Access - See 4.1
1.
Remove burner assembly - See 4.6
2.
Remove burner insulation.
3.
Unscrew 3 screws in burner plate and remove burner.
4.
Re-assemble in reverse order.
4.11 Cleaning Heat Exchanger
•
Gain General Access - See 4.1
1.
Remove burner assembly - See 4.6
2.
Remove 4 wing nuts holding top panel on.
3.
Remove brush from holder and clean as required.
4.
Re-assemble in reverse order.
Note:
If insulation is to be removed wet first to reduce fibre
breakdown.
Important:
After any work carried out involving gas carrying
components a full gas soundness test procedure should be
carried out in accordance with BS 6891.
Summary of Contents for Osprey CF 125
Page 4: ...TECHNICAL DATA Page 4 Fig 2 ...
Page 11: ...Installation Requirements Page 11 Fig 5 Fig 6 ...
Page 12: ...Installation Requirements Page 12 Fig 7 Fig 8 ...
Page 24: ...5 Wiring Diagrams Page 24 Fig 17 ...
Page 25: ...Wiring Diagrams Page 25 Fig 18 ...
Page 26: ...6 Fault Finding Page 26 ...
Page 27: ...Fault Finding Page 27 ...
Page 28: ...Fault Finding Page 28 Fig 19 ...