
2. Installation - Page 13
2.1 Prepare the boiler
These instructions assume you have decided on where the
boiler will be located.
1.
Carefully unpack the boiler.
2.
Do not discard any packaging until all the items are
accounted for.
3.
Position the boiler to ensure the draft diverter is the
required distance from the wall.
4.
Remove the top panel - 2 screws.
5.
Remove the front door - unhook and lift off.
6.
Fit the flue spigot (supplied separately inside the case)
to the draft diverter.
Fig. 9
Summary of Contents for Osprey CF 125
Page 4: ...TECHNICAL DATA Page 4 Fig 2 ...
Page 11: ...Installation Requirements Page 11 Fig 5 Fig 6 ...
Page 12: ...Installation Requirements Page 12 Fig 7 Fig 8 ...
Page 24: ...5 Wiring Diagrams Page 24 Fig 17 ...
Page 25: ...Wiring Diagrams Page 25 Fig 18 ...
Page 26: ...6 Fault Finding Page 26 ...
Page 27: ...Fault Finding Page 27 ...
Page 28: ...Fault Finding Page 28 Fig 19 ...