
9
25/09/2012 - 300029104-001-02
NXR5i
2
`
Establish the location of the frame on the basis of the opening direction of the furnace door and the length of the burner.
Leave enough clearance at the rear of the boiler for water connections and the distributing tube.
Refer to the installation and maintenance instructions of the boiler, Chapter Boiler location.
`
Fit the rear section on the frame, behind the fastening brackets (see detailed drawing) and prop it up.
`
Insert the lower assembly rods in the holes of the rear section and the fastening brackets of the frame, in order to position the rear section
correctly according to the frame
3
`
Clean all the openings in the section with a brush.
Remove any deposit on the bottom of the section.
Boilers: 14, 16, 18, 20, 22, 24 sections
Boilers: 15, 17, 19, 21, 23, 25 sections
00
8
M00
5
Summary of Contents for NXR5i
Page 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Page 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Page 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Page 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Page 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...